Showing posts with label public. Show all posts
Showing posts with label public. Show all posts

Wednesday, November 18, 2026

Using AI to Analyze BC Public Tree Planting Bid Results

For this morning's entertainment, I decided to use AI to analyze some bid results.  Here are some of the background parameters that I adhered to:

- I wanted to use the data that has been posted on the Replant.ca forums over the past decade or so.  I could have used the original data source (BC Bid) but I figured that going to BC Bid would be much more resource-intensive, since agents would need to repeatedly crawl through thousands of unrelated non-planting bids on that site.

- I have the Replant.ca website set up with Cloudflare geo-restrictions, so it can only be accessed by people in certain countries.  I have the main Replant.ca website visible to visitors from twenty countries, but the forums are only visible to people in Canada, Great Britain, Australia, and New Zealand.  This was to prevent server overload from AI agents scraping data.  Earlier this year, the server was sometimes getting 1.5 million hits per day, almost entirely from AI training hits to the forums, and it was limiting access to the board.  I could have temporarily turned the Cloudflare protection off for this task, but instead I decided to change a board setting that limited the number of posts per page (I changed it from 50 to 250).  This allowed each "year" of posts to be displayed on a single respective web page.  Then I visited each year's page and used the Print dialog to save the page to PDF, thereby capturing all data.  Incidentally, if anyone tries this, using "Save to PDF" embeds the data differently than "Microsoft Print to PDF" - which is more image-oriented and less easy to read effectively.

- I uploaded all of my PDFs (one each for 2009 through 2025) into ChatGPTs Work tab.  I asked it first to read and analyze the PDFs, and to make sure it understood the data contained therein.  I then told it that I was going to ignore 2009 to 2014 PDFs for now, and only concentrate on the period from 2015 to 2025 inclusive.  I didn't include 2026, because we're only partway into the bidding season right now.

- I frequently asked Chat to ignore Coastal bids in my various queries. 

- I was using ChatGPT 6.1 Terra on High intensity, even though 6.2 Astra and 6.2 Sol are now available.

- I went into this with the mindset that Chat would probably make mistakes, and since this is just a casual experiment, I wasn't going to go through and replicate the work by hand to verify all results.  I'd do that if this was some sort of critical task, but this is just a fun experiment. 

Now that I've added all of these PDFs to Work, I'm able to analyze them with tons of different queries, over and over again, without Chat needing to scrape data every time.

 

For my first query, I asked Chat to create a chart to graph all bids over time.  Again, I restricted the chart to the period from 2015-2025.  I asked Chat to ignore all bids which didn't have price data.  In order to "clean up" the data somewhat and ignore lottery bids and unrealistically high bids that would throw off averages, I asked Chat to ignore any bids which worked out to greater than $1.50 per tree.

This is the chart that was generated:

 

 

Anyone who is familiar with the bidding over the past decade will probably look at this closely and have two questions:

1.  "Why are there so few bids in 2021 compared to other years?" - This was the second year of Covid, and the government wasn't releasing data right away.  So we just waited until each bid closed, then I collected bid data from each individual contractor so we all had a full set of results behind-the-scenes.  However, we didn't want to share most of that data publicly.

2.  "Why is there a dot in 2025 which looks like a stupidly low price, is that an error by the AI?" - No, that was Marlo's bid in Fort St. John, which ended up being disqualified.

The value of this graph, even if it isn't perfect, is that it gives us a good understanding of how bids have trended upward over time, which is not surprising considering inflation.  And it also shows us years when the herd moved upward or downward.  This probably shows us that planting companies feel the hit of unsustainable pricing in unison.

---

Next, I asked Chat to generate a series of charts for individual companies, to show how each of their bidding attempts evolved over time.  Here are half a dozen examples, picking some of the larger companies or more frequent bidders, presented in alphabetical order:




Fun stuff.

 

---

Next, I asked Chat to summarize which companies had been putting in a lot of bids.  This is the query that I used:

Can you provide me a text list itemizing how many bids each company has submitted during the period from 2015 to 2025 inclusive?  Do not include bids above $1.50/tree.  Do not include bids for which no price per tree was provided in the PDF.  Rank the list from the company with the most bids down to the company with the fewest bids.

I got the following list, which I then amended by grouping companies that had fewer than 20 bids over that 11-year period:

 


That's a lot of bids.  I'm not surprised by the high number at Folklore ... I've driven a lot of miles during viewing season over the past decade and I've walked around blocks which were prescribed for hundreds of millions of trees (also, I was just one of several people doing the viewing work).  Incidentally, when I count up all the blocks that I've visited while viewing, and all the blocks that I was responsible for during my 35 years as a camp supervisor, I estimate that I've visited/seen blocks all over BC and Alberta that added up to more than three hundred and fifty million trees.

---

My next query was about spring versus summer trees.  I wanted to estimate the overall difference between spring and summer trees.  This was my query:

Ignoring any coastal contracts, what do you think the overall weighted average price is in the BC Interior from 2015-2025 for spring trees versus summer trees?  Ignore contracts where there are both spring and summer trees on the same contract.  Ignore Fall contracts.

This was the result:

This result actually surprised me, because there's generally more competition for summer trees, as there are fewer summer trees on the market each year.  However, it's a reassuring result - a lot of summer trees in BC, which are usually in the northern half of the province, are a lot uglier than spring trees due to green-up.

---

Next, let's look back at some of the jobs where the lowest two bids were pretty close:


 

---

 

I think the main thing that everyone needs to remember is that this collection of data is fairly substantial, but it is not complete.  We were missing a few bids each year, we didn't share a significant portion of the 2021 bids, and I probably have a bunch of typos scattered throughout the data.  Also, ChatGPT and other AI's can make mistakes.  I would not place much trust in the complete accuracy of the responses that were generated.  Chat itself frequently pointed out various weaknesses in the underlying data that I provided.

It was a fun exercise, nonetheless.

I'll leave you with some final food for thought.  If you were to do some analysis yourself, what would you ask?  I asked ChatGPT Work to give me some ideas.  This was my query:

I'm thinking about all of the data contained in the 2015-2025 PDFs.  What interesting analysis tasks can you think of, which might provide some fun or interesting insights into the data contained therein?

I got a VERY long answer.  I'll share that in a second, for anyone looking for some data mining inspiration.  But first, if you'd like the collection of PDFs that I used, here's a quick download link to save you some time:

   www.replant.ca/docs/Public_Bid_Results_Archives_2009-2025.zip     (158MB) 

 

I'm out of here for today, it's time to go outside and touch grass, but here's where Chat would like to take you next:

 

There is enough material in those PDFs to explore much more than whether bid prices increased. The most interesting questions, in my view, concern competition, bidding behaviour, regional differences, and how often a contractor’s assessment of a job differs sharply from everyone else’s.

I’d group the possibilities into several broad themes.

1. How competitive were public planting bids?

Number of bidders per contract, over time

For each year, calculate the average and median number of companies bidding on a public contract. We could show the individual contracts as dots and identify years when competition became noticeably stronger or weaker.

Questions this could answer:

  • Did the increase in tree volumes around 2018–2021 lead to fewer bidders per job?
  • Did the number of bidders recover or decline as volumes changed?
  • Were some districts consistently more competitive than others?
  • Were large contracts more likely to attract a crowd than small contracts?

Important detail: For this particular analysis, I would count bidders whose names are listed even when their prices are missing. We would still follow your $1.50 rule where a price is known, but a bidder with no published price could not be classified against that ceiling. I would therefore show those bidders separately or exclude them from the filtered count. That distinction matters especially in 2021.

Does more competition lead to lower bids?

For each contract, compare the number of bidders with:

  • The lowest posted bid.
  • The average bid.
  • The difference between the lowest and second-lowest bids.
  • The spread between the lowest and highest bids.

A scatterplot might reveal, for example, whether jobs with ten or more bidders tended to have tighter pricing than jobs with only two or three.

The challenge is separating cause from correlation. Easy, desirable jobs might attract more bidders and command lower prices because they are easier. Ideally, we would compare contracts within similar regions, seasons, years and size ranges.

How often was there only one bidder?

We could identify every contract in the PDFs that attracted a single bidder and examine:

  • Who submitted the bid.
  • The price per tree.
  • Where and when the work was located.
  • Whether the contract had difficult access, special qualifications or other unusual requirements.
  • How the price compared with similar contracts that attracted multiple bidders.

This could produce a useful catalogue of situations where the public tender process generated little direct competition.

2. What do the bids reveal about company behaviour?

A head-to-head comparison between companies

Pick two companies—say, Folklore and Seneca—and identify contracts on which both submitted bids.

For each shared contract, calculate:

Folklore’s bid per tree minus Seneca’s bid per tree

We could then report:

  • Number of head-to-head bids found.
  • How often each company bid lower.
  • The median difference in cents per tree.
  • The largest differences in each direction.
  • Whether the relationship changed over time.

This is potentially more informative than comparing each company’s overall average. If two companies bid on different mixes of coastal, Interior, spring and summer work, their overall averages are not directly comparable. Looking at the same contracts controls for many of those differences.

We could repeat this for any pair:

  • Folklore versus Dynamic.
  • Seneca versus Brinkman.
  • Torrent versus Coast Range.
  • Spectrum/Wright versus Dynamic.
  • Windfirm versus Whanau.

A head-to-head matrix for the major companies

We could expand the preceding idea into a table or heatmap. Each cell would answer:

When both companies bid on the same job, how often did the company in the row submit the lower bid?

For example, a cell might show 60% over 20 shared bids. The number of shared bids is essential: a 100% rate based on two encounters is far less informative than a 60% rate based on fifty.

We could also express the result as the median cents-per-tree difference rather than simply who was lower.

This would probably be one of the most interesting analyses in the collection.

Who bid most often—and who won most often?

For each company:

  • Number of bids found.
  • Number of times it submitted the lowest posted price.
  • Number of apparent awards, where the PDF confirms the award.
  • Number of times it ranked in the top three.
  • Median bid rank.
  • Percentage of its bids that were lowest.

I would keep “lowest bid” and “awarded contract” separate. The contractor rating system, eligibility decisions, withdrawals and other factors mean those are not always the same thing.

This could show the difference between a company that bids frequently and selectively prices high versus one that bids less often but places near the bottom of the price list.

How selective were different companies?

A company’s bidding pattern could be profiled by:

  • Regions where it bid.
  • Average and median contract size.
  • Spring versus summer work.
  • BCTS versus Ministry or other public clients.
  • Coastal versus Interior work.
  • Percentage of bids where it ranked first, second, third, and so on.

For instance, we might find that one company tended to target large northern Interior programs while another appeared more often on smaller coastal contracts. That would help explain why their overall price averages differ.

We could present this as a set of company profiles, with one page per major contractor.

Which companies showed the greatest variation in bidding?

For each company, measure the spread of its own bids:

  • Lowest and highest qualifying bids.
  • Median bid.
  • Middle 50% of bids.
  • Range after adjusting for year and region.

A company bidding between 40¢ and 90¢ may simply have bid on very different ground. A more useful version would compare how far above or below the other bidders it tended to be on the same job.

For example:

On its shared contracts, did Company A usually stay close to the middle of the pack, or did it alternate between very aggressive and very high bids?

3. Where was money left on the table?

Largest gaps between first and second bids

This is an obvious and entertaining one: rank the contracts by how much the lowest bidder left on the table compared with the second-lowest bidder.

We could measure the gap three ways:

  1. Total dollars: second-lowest bid minus lowest bid.
  2. Cents per tree: second-lowest unit price minus lowest unit price.
  3. Percentage: the difference expressed relative to the lowest bid.

Each metric tells a different story. A 5¢ gap on five million trees is financially much larger than a 20¢ gap on a small contract.

The list could include:

  • Contract number and location.
  • Tree count.
  • Lowest and second-lowest bidders.
  • Their bid amounts and prices per tree.
  • Dollar gap and percentage gap.
  • Any relevant commentary from the post, such as difficult access or an unusual tender specification.

We would identify these as gaps in the posted bids, not money that the winning company necessarily could have captured. Raising its bid might have changed the ranking or the award.

How common were large gaps?

Rather than only highlighting dramatic cases, show the distribution:

  • What percentage of contracts had a first-to-second gap under 2%?
  • How many had a gap under 5%?
  • How many exceeded 10%, 20%, or 50%?
  • Did the typical gap change over the years?

We could make a separate comparison for big jobs versus small jobs and for coastal versus Interior jobs.

Which companies most often submitted a bid far below the field?

For every bid, compare the company’s price with the median of the other bids on the same job.

For example:

A company bid 45¢; the median of its competitors’ bids was 60¢. Its bid was 15¢, or 25%, below the competitors’ median.

We could then identify:

  • The most extreme individual examples.
  • Companies most frequently below the field.
  • Companies most frequently above the field.
  • Whether those patterns changed by year.

I would require a minimum number of competitors—perhaps three other priced bids—before calculating the comparison. Otherwise, one unusually high or low competitor can distort it.

This would need careful language: a low relative bid could reflect better knowledge of the ground, a different operating model, an error, a desire for summer work, or a number of other factors. The numbers alone cannot tell us which.

The closest finishes

At the other extreme, rank the tightest bids:

  • Smallest dollar gap between first and second.
  • Smallest difference in cents per tree.
  • Smallest percentage gap.
  • Closest cluster of the top three or top five bidders.

Your 2025 Terrace example, where Sapling and Summit were separated by $68, would be a strong contender for one of these lists.

For a particularly fun version, we could calculate how many trees would account for the gap at a given price. That would be a descriptive illustration, not a suggestion that contract pricing literally works one tree at a time.

4. How did prices vary by location and job type?

Coastal versus Interior prices

Produce separate annual weighted-average lines for:

  • Interior contracts.
  • Coastal contracts.
  • Possibly a third category for northern and remote coastal work.

This would show whether the gap between coastal and Interior bidding widened or narrowed over the period.

However, “coastal” is not a single operating environment. A Vancouver Island road-access job and a remote inlet contract requiring a boat or helicopter can have very different economics. I would also retain the $1.50 ceiling, which may remove a larger share of the most difficult coastal bids and therefore bias a coastal-versus-Interior comparison. We should report how many bids the ceiling removes from each group.

Prices by district or timber sales office

For locations with enough observations, compare annual weighted averages and distributions for areas such as:

  • Prince George.
  • Mackenzie.
  • Fort St. James/Vanderhoof.
  • Burns Lake/Houston.
  • Quesnel.
  • Williams Lake.
  • Kamloops/Merritt.
  • Cranbrook and the Kootenays.
  • Port McNeill, Campbell River and other coastal offices.

We could make this either a table or a set of small charts. A map could be useful, though the geographic assignment would normally represent the administering office or stated work area, not the exact locations of every block.

Spring versus summer prices

Using contracts clearly identified as spring-only or summer-only, compare the price distributions within the same year and region.

This could test the familiar idea that summer work often sells at a discount because companies want to retain crews after the main spring season.

Potential results:

  • Median spring bid versus median summer bid.
  • Difference between spring and summer lowest bids.
  • Whether the gap changed between, say, 2015 and 2025.
  • Whether the gap was larger in some regions than others.

Mixed spring/summer contracts would need their own category unless the PDFs provide separate volumes and prices for each season.

Does contract size affect price?

Group contracts by the size categories already used in the charts:

Size categoryTrees
SmallFewer than 500,000
Medium500,000–1.5 million
LargeMore than 1.5 million

We could compare prices, bidder counts and first-to-second gaps across those groups.

An interesting question is whether larger contracts generally attract lower prices per tree because fixed costs are spread over more trees—or whether they sometimes attract fewer bidders because fewer companies can take on the volume.

We should compare within the same year and region where practical. A large, straightforward Interior job and a small, complex coastal job are not directly equivalent.

Summer work and the “crew retention discount”

A more targeted version would focus on companies that bid on both:

  • A spring contract; and
  • A summer contract in the same region and year.

We could ask whether the same company tended to bid lower on its summer job. It still would not be a controlled experiment, but it would be more informative than comparing every spring contract with every summer contract.

5. What effect did the contractor rating system have?

How often did the lowest dollar bid fail to rank first?

The posts sometimes explicitly note when contractor ratings changed the order of bidders. We could catalogue those contracts and record:

  • Lowest dollar bidder.
  • Bidder ranked first after the rating adjustment.
  • Difference between their posted bid amounts.
  • Region and year.
  • Whether the PDF confirms the eventual award.

This could show how often rating adjustments visibly affected rankings within this collection. It would not establish the rate across all BCTS contracts, because not every post may identify every adjustment.

Closest decisions affected by ratings

A related list could identify contracts where:

  • The lowest dollar bid was overtaken by a slightly higher bid after ratings; or
  • Ratings moved a bidder several places up or down the award order.

We could look for the largest observed dollar difference between the lowest bid and the first-ranked bid, while being careful to use the actual posted amounts and to distinguish ranking from confirmed award.

For years in which the published prices were described as adjusted prices, we would need to identify that explicitly rather than mixing them silently with original tender amounts.

6. What changed over time?

Inflation-adjusted bid prices

The charts we have made so far use nominal cents per tree: 40¢ in 2015 is compared directly with 40¢ in 2025.

We could adjust the annual figures for inflation and show both:

  • Nominal prices, as posted.
  • Inflation-adjusted prices, expressed in a common year’s dollars.

That would help answer whether bids increased faster than general consumer prices. We could also use a more industry-specific cost measure if we find a suitable one, though no single index perfectly captures planting costs such as wages, food, vehicles, insurance and camp expenses.

This would require external data and a clear choice of inflation index.

A before-and-after view of the volume expansion

We could compare bidding patterns across periods such as:

  • 2015–2017.
  • 2018–2020.
  • 2021–2023.
  • 2024–2025.

For each period, show:

  • Prices.
  • Number of bidders.
  • First-to-second gaps.
  • Regional mix.
  • Contract sizes.
  • Share of bids from each company.

The periods could reveal changes around the beetle, wildfire and increased-reforestation years. They would not, by themselves, establish what caused those changes.

Did bid prices rise at the same pace for all companies?

A multi-line chart could compare companies’ annual tree-weighted averages, but I would also build a stronger same-contract comparison to control for differing work mixes.

That could reveal whether, on jobs where they competed directly, the relative gap between two companies became wider, narrower or reversed over time.

7. Unusual contracts and interesting stories

The PDFs contain your descriptions and discussion, not just bid tables. That makes some more qualitative analyses possible.

A catalogue of unusually difficult specifications

Search the posts for references to:

  • Helicopter access.
  • Boats and barges.
  • Long quadding or walk-in distances.
  • Remote camps.
  • Numerous small blocks.
  • Fill planting and burned ground.
  • Fertilizer requirements.
  • Unusual stock types.
  • Steep or rocky ground.
  • Tight completion windows.
  • Extra survey or supervision obligations.

We could then list the associated contracts and their bids. The result might become a fascinating “why this job priced differently” reference.

Some of those categories would need manual review. A post mentioning a helicopter does not necessarily mean that every block, or even the majority of the trees, required helicopter access.

The biggest disagreements over the same ground

Rank contracts by the difference between the lowest and highest qualifying bid, in both dollars and cents per tree.

A wide range can signal very different assumptions about access, production, logistics, risk or the value of keeping a crew employed. The most interesting cases would pair the numbers with whatever you wrote after looking at the blocks.

Because the $1.50 ceiling removes high bids, it would truncate the spread on some jobs. We could still apply your default ceiling, but flag contracts where at least one higher bid was excluded.

Contracts where nearly everyone agreed

Find jobs where several bidders—perhaps at least five—were clustered within a narrow band. Examples could include:

  • All qualifying bids within 10% of the lowest.
  • At least five bids within 5¢ per tree.
  • The smallest range among jobs with six or more bidders.

This would complement the “largest disagreements” list and might identify jobs where companies had unusually similar expectations.

Your historical predictions versus later results

Your posts often include comments about where you thought prices were headed, whether a job looked attractive, and whether a bid seemed low.

A fun retrospective would collect a selection of those comments and compare them with later information in the PDFs:

  • Predictions that were borne out.
  • Predictions that turned out differently.
  • Jobs where the forum discussion identified a risk that later became relevant.
  • Comments about future industry conditions that look particularly interesting in hindsight.

That would be partly editorial and would need care: the PDFs may not tell us whether a contractor actually made or lost money on a job.

The analyses I would prioritize

If you wanted the most informative first batch, I would start with these:

  1. Head-to-head company comparisons, because they compare bids on the same ground.
  2. Largest and smallest gaps between first and second bids, with contract details.
  3. Number of bidders per contract over time, including a clear treatment of missing prices.
  4. Regional and spring-versus-summer price differences.
  5. Contractor-rating reversals, where the posts provide enough detail.
  6. Inflation-adjusted annual bid prices.

Before doing a large series of comparisons, I would rebuild the underlying bid records into a single auditable table with the source PDF and page for every entry. The work we have already done exposed enough missed entries, repeated posts, name variations and inconsistent figures that it would be unwise to treat the existing chart extractions as a finished database. That table would make it much easier to check any surprising result and would give us a dependable foundation for all of the analyses above.

 

 

 

Monday, October 17, 2022

State Of The Industry, Fall 2022 (Tree Planting in Western Canada)

“Conflicting Economic Data.”  That seems to be the current theme of Canada’s financial reality.  And the same phrase may perfectly describe the situation that western Canada’s planting industry currently finds itself in.  Bear with me for couple paragraphs of economic commentary, before I go more directly into the outlook for the 2023 planting season.  Economic analysis matters, because I believe that a major recession is coming our way like an oncoming freight train.

Around the globe, inflation is running rampant.  It doesn’t really matter how you define inflation, because all indicators are on the rise:  Food, fuel, other energy, consumer goods, services, etc.  Economists could argue for weeks about the current reasons for inflation, but the basic pressures are heavily rooted in energy supply shocks and a couple years of barely-restrained printing of money by various nations’ central banks (mostly to support global economies during Covid).  The current consumer price index inflation numbers are running at slightly over 7% annually in Canada.  As a result, the Bank of Canada has been pushing up the interbank lending rate, which causes banks to increase their prime rates and all other interest rates.

Higher interest rates generally cause people to pay down debt, rather than spending their earnings on fun things.  Therefore, the goal of higher interest rates is to cut down on consumer spending, which reduces demand for goods and services.  In turn, reduced demand normally puts downward pressure on prices for goods and services.  But higher interest rates also hurt a lot of people, because most of Canada’s population has mortgages, credit cards, and/or loans of various types.  We’re getting attacked from both sides, paying more at the pump, more at the grocery store, more for other goods and services, AND dealing with higher interest rates on top of that.  Sure, the higher interest rates will eventually stop prices from rising so quickly, but as I mentioned earlier, I believe that we’re in for a lot of short-term pain over the next 12-24 months.

In terms of wages, the economy is still quite strong, and there are more job opportunities than there are people to fill them.  The current unemployment rate in Canada is pretty low when compared with historical data.  When unemployment is low, employers need to compete harder to attract employees, so wages go up.  Although there are various ways of measuring this, it is likely safe to say that by year-end, wages in Canada will have increased by at least four percent compared to last year.  Unfortunately, a four percent increase in your wages doesn’t seem so great when everything that you buy costs ten percent more than it did a year ago.

The planting industry’s economic health varies from year to year according to many factors, but usually the most significant impact depends on the basic supply/demand of planting contracts, ie. how many trees the industry needs to plant each year.  When overall industry numbers go up (as they did a few years ago, after the 2017 and 2018 wildfire seasons in BC), tree prices go up at a company level.  And sometimes this trickles down to a corresponding increase in planter prices.  When industry volumes go down, companies bid aggressively to chase a diminishing amount of work, and prices go down.  We saw that happen these past twelve months.  The “boom & bust” periods are especially visible in public government work, which accounts for roughly 20% of the trees planted in BC each year.  However, work for private clients makes up the other 80% of industry volume.  Private client pricing (mills, logging operations) is more stable than public tenders, because a lot of that work is based upon multi-year agreements between mills and planting contractors who work together year after year.

Going into 2023, industry volumes are decreasing.  In 2022, we think that BC planted about 286 million trees.  The estimate for 2023 is roughly 262 million trees.  Planting contractors are therefore competing for a piece of a smaller pie.  Supply/demand economics dictate that public bid prices would normally decrease during the Viewing Season (for 2023 projects), which is just starting to ramp up.  But a drop in prices is the last thing that we need right now.

Company owners have numerous expense items to worry about.  Fuel has obviously jumped significantly in the past 12 months.  Buying a truck is more expensive.  Truck rental costs are rising significantly right now for 2023.  Prices for parts are higher, and maintenance/repair costs are way up.  For companies that have a Business Line of Credit or Payroll Credit Facility, interest rates are now double what they were six months ago.  Employer contributions on CPP and EI are also increasing, by 4.38% and 5.56% respectively (which of course is compounded if labour costs are increasing).

Food costs are much higher than a year ago.  The kitchen team from my camp did a comparison study of invoice prices from GFS for 2022 vs. 2021, using a basket of approximately thirty commonly purchased items, and the average price increase was 35.5%.  That’s stunning.  The only people that benefit from this are planters who work out of camp-based operations with kitchens, because they are shielded from these food cost increases (except when buying their own food in town on days off).  But these higher food costs are certainly hurting the companies that run camps.

There may be significant other challenges that companies have to navigate.  I’m a bit out-of-the-loop on this right now, but there were rumours of enhanced requirements for on-site dressing stations in 2023, and also for more ETV’s spread throughout the workforce.  Having more first aid gear available is unquestionably a benefit for workers.  But who is going to pay for this?  The workers?  If company owners don’t recognize and budget for these potential costs, and bid accordingly, that’s exactly what might happen.

Commercial regs for flight crew fatigue are changing for small operators in mid-December (large operators had to implement these same changes 24 months earlier).  Although the exact rules are quite complex, a general starting point is that the maximum length of a pilot’s "duty day" is being cut from 14 hours to roughly 12 hours per day (the exact length will vary based on certain criteria).  This means that if a pilot arrives at the hanger to start pre-flight planning at 5am, they have to be home with the machine parked and flight plans closed by 5pm, which of course means that they will have to leave the field worksite earlier than most of us are accustomed to.  The maximum hours of daily "flight hours" is also being cut, to 8 hours per day, although this won’t have significant impact since the machine isn't usually running that many hours in a day (except maybe up in High Level).  However, the minimum length for the "rest period" from night to morning is being raised from 10 hours to 12 hours.  It thus becomes essentially impossible for a pilot to fly trees out to stock up a block in the evening, then to return early the next morning to move crews. 

Going back to the length of duty day, the 12 hour day is a best-case scenario.  The exact regs are very complex, and depend on things such as the number of flights per day (that's the number of start/stop cycles of the machine's engine, not take-offs and landings).  The duty day length will also depend on the start time in the morning.  When a pilot starts especially early in the morning, their duty day becomes shorter.  So for example, a pilot doing seven or fewer flights in a single duty day, whose flight cycles are typically between 30 and 50 minutes duration, can only have 11 hours for duty day if they start at 5:59am or earlier.  Let's say that you need a pilot on site at 7am to start slinging trees before the planters arrive, but the ferry time from the airfield to Staging is 1hr.  The pilot will need to start their duty day with the pre-flight inspection and filing of flight plan no later than 5:30am in order to get in the air by 6am, and even that is optimistic because most rotary wing operators will budget a full hour from start time to being airborne.  Because the official start of the duty day is earlier than 6am, the pilot is now only allowed to have a duty day length of 11 hours.  So that could mean that the duty day runs from 5:30am to 4:30pm.  But since the pilot needs an hour of ferry time after planting to get back to the airport, AND time for post-flight and closing the flight plan, they really need to start flying home at 3pm.  Which means that planters might need to fly out of the block starting at 2:15pm.

One solution would be to run two pilots with each machine, to give planters a longer day, but helicopter companies would be reluctant to do this because it would double their labour costs.  Machine costs would also increase significantly if a helicopter needed to return to the airfield mid-day for a crew swap.  And on top of that, the industry doesn't have enough high-hour qualified pilots to make that scenario to work on a broad basis.

There are slight variations and allowances to these changes for certain situations, and a commercial pilot will have a better understanding.  Some details are available here, but again, the CARS regs are very complex.  The bottom line is that these changes will probably impact almost all planting operations that use helicopters extensively, so Project Managers need to contact their preferred helicopter providers and get a full understanding of these potential changes, before putting together any more heli budgets.  Helicopter use may become increasingly associated with constrained production.

There is also a good chance that minimum wage will jump significantly before next summer.  That’s great for workers in many underpaid industries.  It’s also good for tree planters, because companies that hire first-time workers must pay everyone at least the equivalent of minimum wage (including overtime) if their piece-rate earnings are not sufficient.  Will companies that hire large numbers of first-time planters have the foresight to plan for this possibility, and adjust bid prices upward?  A rising tide floats all boats.

Let’s go back to the lower industry volumes.  Can anything be done about this?  A few years ago, we thought that volumes would be historically strong for the next several years.  Part of that was based on the assumption of strong growth of federal tree planting projects, from programs such as the federal “2 Billion Trees” initiative.  But the 2BT program is struggling to scale up quickly, which isn’t a real surprise.  I’m quite familiar with the program, having acted as a project lead proponent for small projects both this year and last year, but my work (on the east coast) has been with very small numbers of seedlings.  For 2BT to work, big players need to design projects that will result in tens of millions of trees being planted, and there are a lot of challenges associated with designing such a project (especially in figuring out where to plant the trees).

In a perfect world, several of the dozen largest planting contractors would each purposefully plan to scale back operations in 2023 by retiring a camp.  I know of at least one major contractor that has already made a conscious decision to do exactly that.  If several companies planned to downsize this way, there would be less concern about the limited number of trees that are available for 2023.  But wait, why should we expect just the biggest companies to save the day?  If every company (regardless of size) downsized by just 8.3%, then the overall 2023 volume would be appropriate for the slightly smaller planting industry.  In such a scenario, supply-based downward pricing pressure would disappear, and bid prices would undoubtedly jump significantly.  Company owners AND their workforces would benefit.  Our industry is nimble enough to do this, but do company owners have the resolve?  Again, it’s the company owners that are hurting themselves if they don’t understand the need for every company to scale back slightly.

Planters expect wages to increase in 2023.  They know that wages are increasing in just about every other sector, and they know that workers are scarce.  What will happen if bid prices decline this fall, and owners have to tell planters after Christmas that planter prices are staying the same?  How many planters will seek employment elsewhere?  Will planting companies be able to hire enough people to get through 2023?  A lot of companies struggled to get their trees planted last year due to hiring challenges, and million of “spring” trees didn’t get planted until July.  Hiring will likely be even harder this year, considering the general labour market situation, so why risk chasing too many trees?  It’s better for companies to aim to scale back.

What else can planters (and companies) expect from 2023?  Well, from what I’ve seen so far, there are a few challenges to look forward to:

-        Head Protection:  WorkSafe has mandated the use of head protection on ALL understory planting in BC from now on.  While a hardhat may not protect you if an entire tree falls onto you, it could make a difference if you get hit by a dead branch.  Of course, hard hats bring their own separate problems, and planters hate wearing them.  Incidentally, we’re also seeing an increase in expectations for due diligence with more detailed DTA assessments.

-        Wildfire Planting:  There has been a LOT of wildfire restoration work in BC in the past four years.  Probably more than twenty companies have worked in the Elephant Hill fire alone since 2018.  Planting continues there, but so does grass encroachment.  As the grass spreads each year, the difficulty increases.

-        Plastic Ribbon:  The Cariboo-Chilcotin region (ranchland) banned the dropping of plastic flagger this past year, to protect cattle from eating plastic.  The full impact of this change was not felt in 2022, as a lot of multi-year contracts were still in progress.  But several multi-year contracts just ended, and the flagger ban throughout this region will be more ubiquitous in 2023.  Couple this with thicker grass in the burns, and we’re going to see a lot of double plants in 2023.  The industry MUST find a cost-effective supply of biodegradable ribbon soon, or loosen up spacing rules.  There are now a limited number of 500' rolls of corn starch ribbon available from Motion for $2.87 per roll, which is approximately three times the cost of polyethylene plastic flagger.  But if everyone bidding on no-flagger contracts were to add another 1.0 cents per tree to their bid price, that would be enough to purchase one roll of biodegradable flagger for roughly every one box of trees planted.  Bidders can pass the cost of this product on to clients!  We just need to make sure that every bidder factors that cost into their bid prices.  Easier said than done, of course.  Also, that price might eventually come down some, if the industry starts buying the corn starch product in large quantities.

-        Unwrapped Trees:  Again on the theme of saving plastic, more planters may see boxes being shipped this year without bundle wrappers.  It’s a great concept.  Single-use plastic is no good for anyone.  If western Canada plants 400 million trees per year including the prairies, that’s probably 30 million bundle wrappers per year that end up in landfills and occasionally scattered across blocks.  And aside from the plastic, if it takes 5 seconds to unwrap each bundle, that’s costing planters 2.5 million minutes each year.  I’m all for reducing plastic, and I’m quite familiar with planting trays of unwrapped trees on the east coast.  But when planters have to share boxes and each person has to do a count of their share of the box, unwrapped trees become a challenge.  We've also discovered that some nursery packing crews can’t count, resulting in boxes that don't have the correct number of seedlings in them.  When boxes are overfilled, it hurts the nursery, it hurts the planters, and it indirectly hurts the planting companies.  Nobody benefits except the Clients, who get free trees.  Nurseries that are moving in this direction need to implement working quality control systems BEFORE unwrapped trees become more widespread.  Perhaps it would help to tie the bundles with twine?  Or even better, wrap them in a band of light kraft paper or wax paper with a small piece of masking tape to seal the wrapper.  That would continue to protect the plugs better than a box of loose trees, which the forestry clients would prefer.  And it would allow for better monitoring of counts (both on the planter side and the nursery side), while still eliminating plastic wrappers.

-        Vehicle Safety:  I'll cautiously comment that vehicle safety seems to be improving slightly throughout the industry in the past few years.  Yes, I'm aware of some exceptions, and some accidents.  But we're generally seeing more common sense.  I have to give a shout out to ABBA here.  My crews meet a lot of other companies on the road, and this year, ABBA wins my award for the most professional radio use and cautious driving, at least when we worked in the same area back in April/May.  There seems to more of a safety-driven impetus from some Clients recently, a few of whom are asking for GPS trackers and/or dash cams (audio off) in their contractors' vehicles.  These devices probably make some people drive more cautiously, which is good.  A side note:  For anyone working in the Sparks wildfire area in 2023, be careful.  Some of those roads are going to be pretty sketchy when they're wet.

-        Access:  I’ll focus again on the regions where wildfire planting has been happening for the past few years.  It’s safe to say that in those regions, the low-hanging fruit has been plucked.  Each year, the blocks become more difficult to access.  Helicopter work is becoming more common.  And that brings up a good point.  What happens if someone gets hurt on a block where it’s impossible to extract a seriously injured patient without a helicopter?  Do companies have helicopters on standby for emergency situations such as this?  This is a good time to put in a plug for the services of the TEAAM helicopter recovery service for remote workers.

In terms of fire activity, as of October 17th there were still 202 active wildfires burning in BC.  That's crazy.  I've never seen so much active smoke during a Viewing Season.  Many of these fires will impact our industry in 2024 and beyond.

This year’s Viewing Season is really just getting under way in earnest in the past two weeks, and companies are on the edge of their seat about what will happen.  Will we see lower prices, due to decreased industry volumes?  Will we see higher prices, due to a recognition of how inflation is significantly affecting the cost of running a company?  We’re in the middle of an economic tug-of-war.  Now you see why I started off with the phrase, “Conflicting economic data.”  If company owners are smart, most of them will downsize slightly.  If that happens, bid prices will increase this year DESPITE the lower industry volumes, and companies will be able to react appropriately to general wage and inflation trends.

Considering what we had to deal with for the last three years, it seems crazy to say that 2023 may be the most challenging year that the industry has seen in decades.  But this time, the challenge will be economic rather than a global health pandemic.  Let’s hope, in the coming weeks, that company owners will bid appropriately …

 

Jonathan “Scooter” Clark 

www.replant.ca

 

Comment, December 15th - Many companies chased volume, and bid prices are down overall (sometimes significantly) from the levels of two years ago.  I'll put together a full report by the time the WFCA Conference happens at the end of January, and I'll link that here.

 


 

 

Links to Previous "State Of The Industry" Posts:

Fall 2021:  https://jonathan-scooter-clark.blogspot.com/2021/10/state-of-industry-fall-2021-bc-tree.html

Spring 2021:  https://jonathan-scooter-clark.blogspot.com/2021/04/state-of-industry-2021.html

Fall 2019:  https://jonathan-scooter-clark.blogspot.com/2019/09/state-of-industry-2019-bc-tree-planting.html

Fall 2018:  https://jonathan-scooter-clark.blogspot.com/2018/09/state-of-industry-british-columbia-tree.html



 

Sunday, October 20, 2019

The Relationship between Target Density and Minimum Spacing

If you're a forester right now, you're probably trying to figure out how to manage your budget, considering that planting prices are trending back (somewhat) to be on par with their inflation-adjusted historical numbers from the 1990's and early 2000's.  Some foresters (mostly in the private sector) are cutting back slightly on volumes, others are dropping helicopter blocks from their programs, and some are eliminating fertilizer packs (tea-bags).

I'd like to throw out a suggestion that may be useful for a few foresters:  Take a close look at your planting specs.  To be clear, I'm not saying, "Let us plant shitty trees."

Instead, I'd like to take a close look at the science and math behind certain specs, specifically as they relate to spacing/density/excess.  I'm going to refer to the FS 704 system which is used by BC government offices, and also used by many private mills throughout the province and in Alberta.

One of the goals when the FS 704 was designed was to build in a "spacing tolerance" to allow the planter some leeway in picking the best microsite, or the best spot to plant a tree.  Yes, hitting a specific target density within a block is important, but the designers of the 704 system didn't want to be so rigid that planters would simply plant a tree at the perfect spacing every time, with no regard for how suitable that microsite was for the tree.  If there was no spacing tolerance, the benefits of hitting density would be outweighed by decreased yields and increased mortality from trees being planted in poor spots.  A planter might plant a tree in a pile of sticks or needles or chunky red rot, instead of planting in a microsite only 12 inches away that had appropriate soils.

In general, depending on the region, spacing tolerances usually allow for about a meter of tolerance.  For example, if the target spacing is 2.7m between each tree (thinking in both the X/Y axis, or both "ahead" and "laterally") then a simple generalization is that a tree is considered to be good if the tree is somewhere between 1.7m and 3.7m away from all of the other trees around it.  You don't want all of them to be only 1.7m away from the others, or all of them to be 3.7m away from the others; you want a healthy mix of some closer and some further, so the overall average spacing still balances out to be pretty close to the target (2.7m in this example).  However, this variability or spacing tolerance allows the planters to feel more comfortable in looking for the best microsites for the trees, without having to worry too much that they're going to get faulted for "tree too close" or "missed spot" penalties.  Having a spacing tolerance is ultimately what's best for the plantation, as long as the planters utilize the tolerance to hit the best microsites for the trees.

We've seen an increase over the past several years in the amount of FFT (Forests For Tomorrow) funding on reforestation contracts in BC, mainly due to wildfire restoration.  Traditionally, the average target spacing on BCTS and MOF contracts within British Columbia was usually in the range of 1400-1600 stems/Ha (except on the coast).  However, a lot of FFT funding is attached to projects and blocks where the target spacing has climbed to 2000 stems/Ha or even more.  And I'm not disagreeing with this change.  A lot of the wildfire damage has come in pine stands, for multiple reasons (pine is more dominant on dried ground, mountain pine beetle has killed and dried a lot of standing pine, etc.).  Pine is a species which grows better at higher densities.  If you're going to plant one stand at 2400 stems/Ha and another at 1600 stems/Ha, and you have pine for one stand and spruce/fir for the other, you're almost certainly going to plant the pine in the high density stand.

The problem is that while densities have frequently increased from 1600 stems/Ha to 2000 stems/Ha, there hasn't always been a corresponding drop in "minimum acceptable inter-tree distances" (MITD), more casually known as "minimums."  The minimum spacing on 1600 stems was usually 2.0m between trees.  Unfortunately, the minimums on some 2000 stem target densities are still set at 2.0m.

To be clear, for non-foresters who are reading this, a 2.0m minimum means that if you plant two trees and they're 2.1m apart, that's acceptable.  If they're 2.0m apart, that's acceptable.  If they're less than 2.0m apart, one of the two trees gets faulted as a "too close" tree, which gets counted as a quality fault under the FS 704 system, and a reduction in the assessed quality of the block means a reduction in payment to the planting company.

Let's look at the TARGET spacing distances that are required to meet various densities:



Under a target density of 1600 stems/Ha, all trees are supposed to be 2.7 meters apart (on average).  This means that with a 2.0m minimum, the planter has at least 70 centimeters (on the close side) to work with.  There's also a tolerance on the "further apart" side, but the method of calculating that exact distance is complex (it relates to "missed spot" assessments).  Let's just focus on the close side.  Under a target density of 1400 stems/Ha, the trees need to be about 2.9m apart, which means that the spacing tolerance before being assessed as "too close" has increased to 90 centimeters.

Let me switch focus for a moment here, and go back to the goal of hitting the best possible microsites for the trees.  On some planting contracts, foresters ask for "obstacle planting" to come into play.  This approach asks the planters to plant seedlings beside an "obstacle" to maximize growth and/or survival.  Typically, logs and stumps are viewed as excellent obstacles (unless root diseases in stumps is a consideration).  A planter can even consider a big rock to count as an obstacle if there are no stumps or logs that are close enough.  There are different reasons why obstacle planting is useful.  In cattle country, a cow is less likely to step on a seedling if it is very close to a stump or log.  In the Alberta foothills of the Rocky Mountains, a tree planted on the correct side of an obstacle is possibly protected from chinook winter winds that lead to exposure and desiccation (snow is a good insulating blanket in the winter).  Anywhere that extreme heat is a problem, a tree planted on the northeast side of an obstacle is usually protected from the hottest afternoon sun, at least for the first couple years.  Expect obstacle planting to be useful then in both cattle country and in the most southern regions of Alberta and BC.  The relative "direction" of the obstacle (in relation to the microsite for the seedling) is important when weather-related, and unimportant when cattle-related.

If a planter is being asked to seek obstacles, the spacing tolerance comes into play.  Depending on the terrain, there may be anywhere from a few to a dozen "acceptable obstacles" in a plot.  When there are less obstacles than trees, it becomes obvious that not every tree can have an obstacle.  It also becomes obvious that the planter has to think carefully about where to put trees, in order to maximize the use of any obstacles that are available.

Let's say that there are only five useful obstacles in a given "plot" (a section of the block covering 50 square meters).  Without delving deeply into the math, you can multiply the number of obstacles in a plot by 200 to come up with the expected number of obstacles in a full hectare (because 50 square meters is 1/200th of a hectare).  So if you multiply 5 x 200 you get 1000 obstacles per hectare.  You can use the same spacing chart above to see that the obstacles, on average, are about 3.4 meters apart.

If the "perfect spacing" for your next tree puts the tree in a very specific microsite, and you have a 70 cm spacing tolerance away from that spot, what is the chance that you'll be able to utilize a good obstacle if the average spacing between obstacles is 3.4 meters?  You might be close enough to an obstacle to use it, or you might not be.  You'll certainly be able to hit some of the obstacles in your piece, but not all.  The math (and spacing rules) may make it impossible to hit all obstacles.  But a larger spacing tolerance is better than a small one.

Going back to the high planting densities on FFT funded work (usually 2000 stems/Ha), the planters don't have a lot to work with in cases where the minimum has not be adjusted downward.  For 2000 stem density, the average spacing is 2.4m.  If the minimum is 2.0m, the planters only have 40 centimeters to work with.  Look down at the ground (or floor) right now, and imagine that.  If you put an "X" on a specific spot, you have only a little over fifteen inches of flexibility that you can use to move the tree from that "X" and still be within your tolerance.  What's the chance that you'll be able to find an acceptable obstacle in that very small area?

If the MITD does not allow for sufficient spacing tolerance, it leads to planters planting in bad microsites, rather than encouraging good microsites.

My camp planted a BCTS contract last year with target spacing of 2000 stems/Ha, a minimum of 2.0m, and a requirement to try to utilize obstacles.  It was terrible.  The science made it almost impossible for the planters to meet all three requirements simultaneously.  They made a valiant effort.  When I said that 2000 stems/Ha was the priority, they could do it.  When I said that no trees could be closer together than 2.0m, they could do it.  And when I said that they should try to hit obstacles, they did it.  In fact, they could even do any two of those three things simultaneously, with no problems.  But doing all three simultaneously was almost impossible.  My solution was to ask the forester what should be sacrificed.  There wasn't much movement on minimums, and I was told that obstacles were really important, so I said that my only solution would be to tell the planters not to worry much about the density.  I told them to consider obstacles and minimums to be very important.  Although a density of 2000 stems/ha was requested, there were no penalties in the contract for planting a lower density.  However, there were penalties for planting trees too close (B1, a quality fault) or not utilizing the obstacles.  In the end, we ended up having tons of trees left over after we finished planting all the regular blocks on the contract, and we had to scramble to find a number of overflow blocks to accommodate the rest of the trees.  This was a challenge, both for us and for the foresters.  But in the end, it was the inevitable choice.

I see that a lot of contracts this year, in one region in particular, are once again asking for that difficult combination of 2000 density, obstacle planting, and a 2.0m minimum.  That's unfortunate.  I would think that the industry would realize that this is a big mistake, and these specs are very problematic for planters.  And "problematic" leads to higher bid prices.  The problem could be mitigated by reducing the MITD down to 1.6m as acceptable.  Foresters would be more likely to achieve their planned densities, and there would be better utilization of obstacles.  In many other regions, minimum spacing ranges from 1.5m down to as low as 1.0m.

For this year, I've asked my employer to bid especially high on those contracts, because I don't want my camp to work there.  For foresters who are trying to manage their budgets, a bit of flexibility on these specs would lead to more competitive bidding.  In the past, I've really enjoyed working with the foresters in the region that I'm referring to.  But in the end, I have to think about the best interests' of my planters, and seek to work elsewhere.


If you want to follow public bid results on tree planting contracts within British Columbia, visit this link: