Using AI to Analyze BC Public Tree Planting Bid Results

For this morning's entertainment, I decided to use AI to analyze some bid results.  Here are some of the background parameters that I adhered to:

- I wanted to use the data that has been posted on the Replant.ca forums over the past decade or so.  I could have used the original data source (BC Bid) but I figured that going to BC Bid would be much more resource-intensive, since agents would need to repeatedly crawl through thousands of unrelated non-planting bids on that site.

- I have the Replant.ca website set up with Cloudflare geo-restrictions, so it can only be accessed by people in certain countries.  I have the main Replant.ca website visible to visitors from twenty countries, but the forums are only visible to people in Canada, Great Britain, Australia, and New Zealand.  This was to prevent server overload from AI agents scraping data.  Earlier this year, the server was sometimes getting 1.5 million hits per day, almost entirely from AI training hits to the forums, and it was limiting access to the board.  I could have temporarily turned the Cloudflare protection off for this task, but instead I decided to change a board setting that limited the number of posts per page (I changed it from 50 to 250).  This allowed each "year" of posts to be displayed on a single respective web page.  Then I visited each year's page and used the Print dialog to save the page to PDF, thereby capturing all data.  Incidentally, if anyone tries this, using "Save to PDF" embeds the data differently than "Microsoft Print to PDF" - which is more image-oriented and less easy to read effectively.

- I uploaded all of my PDFs (one each for 2009 through 2025) into ChatGPTs Work tab.  I asked it first to read and analyze the PDFs, and to make sure it understood the data contained therein.  I then told it that I was going to ignore 2009 to 2014 PDFs for now, and only concentrate on the period from 2015 to 2025 inclusive.  I didn't include 2026, because we're only partway into the bidding season right now.

- I frequently asked Chat to ignore Coastal bids in my various queries. 

- I was using ChatGPT 6.1 Terra on High intensity, even though 6.2 Astra and 6.2 Sol are now available.

- I went into this with the mindset that Chat would probably make mistakes, and since this is just a casual experiment, I wasn't going to go through and replicate the work by hand to verify all results.  I'd do that if this was some sort of critical task, but this is just a fun experiment. 

Now that I've added all of these PDFs to Work, I'm able to analyze them with tons of different queries, over and over again, without Chat needing to scrape data every time.

 

For my first query, I asked Chat to create a chart to graph all bids over time.  Again, I restricted the chart to the period from 2015-2025.  I asked Chat to ignore all bids which didn't have price data.  In order to "clean up" the data somewhat and ignore lottery bids and unrealistically high bids that would throw off averages, I asked Chat to ignore any bids which worked out to greater than $1.50 per tree.

This is the chart that was generated:

 

 

Anyone who is familiar with the bidding over the past decade will probably look at this closely and have two questions:

1.  "Why are there so few bids in 2021 compared to other years?" - This was the second year of Covid, and the government wasn't releasing data right away.  So we just waited until each bid closed, then I collected bid data from each individual contractor so we all had a full set of results behind-the-scenes.  However, we didn't want to share most of that data publicly.

2.  "Why is there a dot in 2025 which looks like a stupidly low price, is that an error by the AI?" - No, that was Marlo's bid in Fort St. John, which ended up being disqualified.

The value of this graph, even if it isn't perfect, is that it gives us a good understanding of how bids have trended upward over time, which is not surprising considering inflation.  And it also shows us years when the herd moved upward or downward.  This probably shows us that planting companies feel the hit of unsustainable pricing in unison.

---

Next, I asked Chat to generate a series of charts for individual companies, to show how each of their bidding attempts evolved over time.  Here are half a dozen examples, picking some of the larger companies or more frequent bidders, presented in alphabetical order:




Fun stuff.

 

---

Next, I asked Chat to summarize which companies had been putting in a lot of bids.  This is the query that I used:

Can you provide me a text list itemizing how many bids each company has submitted during the period from 2015 to 2025 inclusive?  Do not include bids above $1.50/tree.  Do not include bids for which no price per tree was provided in the PDF.  Rank the list from the company with the most bids down to the company with the fewest bids.

I got the following list, which I then amended by grouping companies that had fewer than 20 bids over that 11-year period:

 


That's a lot of bids.  I'm not surprised by the high number at Folklore ... I've driven a lot of miles during viewing season over the past decade and I've walked around blocks which were prescribed for hundreds of millions of trees (also, I was just one of several people doing the viewing work).  Incidentally, when I count up all the blocks that I've visited while viewing, and all the blocks that I was responsible for during my 35 years as a camp supervisor, I estimate that I've visited/seen blocks all over BC and Alberta that added up to more than three hundred and fifty million trees.

---

My next query was about spring versus summer trees.  I wanted to estimate the overall difference between spring and summer trees.  This was my query:

Ignoring any coastal contracts, what do you think the overall weighted average price is in the BC Interior from 2015-2025 for spring trees versus summer trees?  Ignore contracts where there are both spring and summer trees on the same contract.  Ignore Fall contracts.

This was the result:

This result actually surprised me, because there's generally more competition for summer trees, as there are fewer summer trees on the market each year.  However, it's a reassuring result - a lot of summer trees in BC, which are usually in the northern half of the province, are a lot uglier than spring trees due to green-up.

---

Next, let's look back at some of the jobs where the lowest two bids were pretty close:


 

---

 

I think the main thing that everyone needs to remember is that this collection of data is fairly substantial, but it is not complete.  We were missing a few bids each year, we didn't share a significant portion of the 2021 bids, and I probably have a bunch of typos scattered throughout the data.  Also, ChatGPT and other AI's can make mistakes.  I would not place much trust in the complete accuracy of the responses that were generated.  Chat itself frequently pointed out various weaknesses in the underlying data that I provided.

It was a fun exercise, nonetheless.

I'll leave you with some final food for thought.  If you were to do some analysis yourself, what would you ask?  I asked ChatGPT Work to give me some ideas.  This was my query:

I'm thinking about all of the data contained in the 2015-2025 PDFs.  What interesting analysis tasks can you think of, which might provide some fun or interesting insights into the data contained therein?

I got a VERY long answer.  I'll share that in a second, for anyone looking for some data mining inspiration.  But first, if you'd like the collection of PDFs that I used, here's a quick download link to save you some time:

   www.replant.ca/docs/Public_Bid_Results_Archives_2009-2025.zip     (158MB) 

 

I'm out of here for today, it's time to go outside and touch grass, but here's where Chat would like to take you next:

 

There is enough material in those PDFs to explore much more than whether bid prices increased. The most interesting questions, in my view, concern competition, bidding behaviour, regional differences, and how often a contractor’s assessment of a job differs sharply from everyone else’s.

I’d group the possibilities into several broad themes.

1. How competitive were public planting bids?

Number of bidders per contract, over time

For each year, calculate the average and median number of companies bidding on a public contract. We could show the individual contracts as dots and identify years when competition became noticeably stronger or weaker.

Questions this could answer:

  • Did the increase in tree volumes around 2018–2021 lead to fewer bidders per job?
  • Did the number of bidders recover or decline as volumes changed?
  • Were some districts consistently more competitive than others?
  • Were large contracts more likely to attract a crowd than small contracts?

Important detail: For this particular analysis, I would count bidders whose names are listed even when their prices are missing. We would still follow your $1.50 rule where a price is known, but a bidder with no published price could not be classified against that ceiling. I would therefore show those bidders separately or exclude them from the filtered count. That distinction matters especially in 2021.

Does more competition lead to lower bids?

For each contract, compare the number of bidders with:

  • The lowest posted bid.
  • The average bid.
  • The difference between the lowest and second-lowest bids.
  • The spread between the lowest and highest bids.

A scatterplot might reveal, for example, whether jobs with ten or more bidders tended to have tighter pricing than jobs with only two or three.

The challenge is separating cause from correlation. Easy, desirable jobs might attract more bidders and command lower prices because they are easier. Ideally, we would compare contracts within similar regions, seasons, years and size ranges.

How often was there only one bidder?

We could identify every contract in the PDFs that attracted a single bidder and examine:

  • Who submitted the bid.
  • The price per tree.
  • Where and when the work was located.
  • Whether the contract had difficult access, special qualifications or other unusual requirements.
  • How the price compared with similar contracts that attracted multiple bidders.

This could produce a useful catalogue of situations where the public tender process generated little direct competition.

2. What do the bids reveal about company behaviour?

A head-to-head comparison between companies

Pick two companies—say, Folklore and Seneca—and identify contracts on which both submitted bids.

For each shared contract, calculate:

Folklore’s bid per tree minus Seneca’s bid per tree

We could then report:

  • Number of head-to-head bids found.
  • How often each company bid lower.
  • The median difference in cents per tree.
  • The largest differences in each direction.
  • Whether the relationship changed over time.

This is potentially more informative than comparing each company’s overall average. If two companies bid on different mixes of coastal, Interior, spring and summer work, their overall averages are not directly comparable. Looking at the same contracts controls for many of those differences.

We could repeat this for any pair:

  • Folklore versus Dynamic.
  • Seneca versus Brinkman.
  • Torrent versus Coast Range.
  • Spectrum/Wright versus Dynamic.
  • Windfirm versus Whanau.

A head-to-head matrix for the major companies

We could expand the preceding idea into a table or heatmap. Each cell would answer:

When both companies bid on the same job, how often did the company in the row submit the lower bid?

For example, a cell might show 60% over 20 shared bids. The number of shared bids is essential: a 100% rate based on two encounters is far less informative than a 60% rate based on fifty.

We could also express the result as the median cents-per-tree difference rather than simply who was lower.

This would probably be one of the most interesting analyses in the collection.

Who bid most often—and who won most often?

For each company:

  • Number of bids found.
  • Number of times it submitted the lowest posted price.
  • Number of apparent awards, where the PDF confirms the award.
  • Number of times it ranked in the top three.
  • Median bid rank.
  • Percentage of its bids that were lowest.

I would keep “lowest bid” and “awarded contract” separate. The contractor rating system, eligibility decisions, withdrawals and other factors mean those are not always the same thing.

This could show the difference between a company that bids frequently and selectively prices high versus one that bids less often but places near the bottom of the price list.

How selective were different companies?

A company’s bidding pattern could be profiled by:

  • Regions where it bid.
  • Average and median contract size.
  • Spring versus summer work.
  • BCTS versus Ministry or other public clients.
  • Coastal versus Interior work.
  • Percentage of bids where it ranked first, second, third, and so on.

For instance, we might find that one company tended to target large northern Interior programs while another appeared more often on smaller coastal contracts. That would help explain why their overall price averages differ.

We could present this as a set of company profiles, with one page per major contractor.

Which companies showed the greatest variation in bidding?

For each company, measure the spread of its own bids:

  • Lowest and highest qualifying bids.
  • Median bid.
  • Middle 50% of bids.
  • Range after adjusting for year and region.

A company bidding between 40¢ and 90¢ may simply have bid on very different ground. A more useful version would compare how far above or below the other bidders it tended to be on the same job.

For example:

On its shared contracts, did Company A usually stay close to the middle of the pack, or did it alternate between very aggressive and very high bids?

3. Where was money left on the table?

Largest gaps between first and second bids

This is an obvious and entertaining one: rank the contracts by how much the lowest bidder left on the table compared with the second-lowest bidder.

We could measure the gap three ways:

  1. Total dollars: second-lowest bid minus lowest bid.
  2. Cents per tree: second-lowest unit price minus lowest unit price.
  3. Percentage: the difference expressed relative to the lowest bid.

Each metric tells a different story. A 5¢ gap on five million trees is financially much larger than a 20¢ gap on a small contract.

The list could include:

  • Contract number and location.
  • Tree count.
  • Lowest and second-lowest bidders.
  • Their bid amounts and prices per tree.
  • Dollar gap and percentage gap.
  • Any relevant commentary from the post, such as difficult access or an unusual tender specification.

We would identify these as gaps in the posted bids, not money that the winning company necessarily could have captured. Raising its bid might have changed the ranking or the award.

How common were large gaps?

Rather than only highlighting dramatic cases, show the distribution:

  • What percentage of contracts had a first-to-second gap under 2%?
  • How many had a gap under 5%?
  • How many exceeded 10%, 20%, or 50%?
  • Did the typical gap change over the years?

We could make a separate comparison for big jobs versus small jobs and for coastal versus Interior jobs.

Which companies most often submitted a bid far below the field?

For every bid, compare the company’s price with the median of the other bids on the same job.

For example:

A company bid 45¢; the median of its competitors’ bids was 60¢. Its bid was 15¢, or 25%, below the competitors’ median.

We could then identify:

  • The most extreme individual examples.
  • Companies most frequently below the field.
  • Companies most frequently above the field.
  • Whether those patterns changed by year.

I would require a minimum number of competitors—perhaps three other priced bids—before calculating the comparison. Otherwise, one unusually high or low competitor can distort it.

This would need careful language: a low relative bid could reflect better knowledge of the ground, a different operating model, an error, a desire for summer work, or a number of other factors. The numbers alone cannot tell us which.

The closest finishes

At the other extreme, rank the tightest bids:

  • Smallest dollar gap between first and second.
  • Smallest difference in cents per tree.
  • Smallest percentage gap.
  • Closest cluster of the top three or top five bidders.

Your 2025 Terrace example, where Sapling and Summit were separated by $68, would be a strong contender for one of these lists.

For a particularly fun version, we could calculate how many trees would account for the gap at a given price. That would be a descriptive illustration, not a suggestion that contract pricing literally works one tree at a time.

4. How did prices vary by location and job type?

Coastal versus Interior prices

Produce separate annual weighted-average lines for:

  • Interior contracts.
  • Coastal contracts.
  • Possibly a third category for northern and remote coastal work.

This would show whether the gap between coastal and Interior bidding widened or narrowed over the period.

However, “coastal” is not a single operating environment. A Vancouver Island road-access job and a remote inlet contract requiring a boat or helicopter can have very different economics. I would also retain the $1.50 ceiling, which may remove a larger share of the most difficult coastal bids and therefore bias a coastal-versus-Interior comparison. We should report how many bids the ceiling removes from each group.

Prices by district or timber sales office

For locations with enough observations, compare annual weighted averages and distributions for areas such as:

  • Prince George.
  • Mackenzie.
  • Fort St. James/Vanderhoof.
  • Burns Lake/Houston.
  • Quesnel.
  • Williams Lake.
  • Kamloops/Merritt.
  • Cranbrook and the Kootenays.
  • Port McNeill, Campbell River and other coastal offices.

We could make this either a table or a set of small charts. A map could be useful, though the geographic assignment would normally represent the administering office or stated work area, not the exact locations of every block.

Spring versus summer prices

Using contracts clearly identified as spring-only or summer-only, compare the price distributions within the same year and region.

This could test the familiar idea that summer work often sells at a discount because companies want to retain crews after the main spring season.

Potential results:

  • Median spring bid versus median summer bid.
  • Difference between spring and summer lowest bids.
  • Whether the gap changed between, say, 2015 and 2025.
  • Whether the gap was larger in some regions than others.

Mixed spring/summer contracts would need their own category unless the PDFs provide separate volumes and prices for each season.

Does contract size affect price?

Group contracts by the size categories already used in the charts:

Size categoryTrees
SmallFewer than 500,000
Medium500,000–1.5 million
LargeMore than 1.5 million

We could compare prices, bidder counts and first-to-second gaps across those groups.

An interesting question is whether larger contracts generally attract lower prices per tree because fixed costs are spread over more trees—or whether they sometimes attract fewer bidders because fewer companies can take on the volume.

We should compare within the same year and region where practical. A large, straightforward Interior job and a small, complex coastal job are not directly equivalent.

Summer work and the “crew retention discount”

A more targeted version would focus on companies that bid on both:

  • A spring contract; and
  • A summer contract in the same region and year.

We could ask whether the same company tended to bid lower on its summer job. It still would not be a controlled experiment, but it would be more informative than comparing every spring contract with every summer contract.

5. What effect did the contractor rating system have?

How often did the lowest dollar bid fail to rank first?

The posts sometimes explicitly note when contractor ratings changed the order of bidders. We could catalogue those contracts and record:

  • Lowest dollar bidder.
  • Bidder ranked first after the rating adjustment.
  • Difference between their posted bid amounts.
  • Region and year.
  • Whether the PDF confirms the eventual award.

This could show how often rating adjustments visibly affected rankings within this collection. It would not establish the rate across all BCTS contracts, because not every post may identify every adjustment.

Closest decisions affected by ratings

A related list could identify contracts where:

  • The lowest dollar bid was overtaken by a slightly higher bid after ratings; or
  • Ratings moved a bidder several places up or down the award order.

We could look for the largest observed dollar difference between the lowest bid and the first-ranked bid, while being careful to use the actual posted amounts and to distinguish ranking from confirmed award.

For years in which the published prices were described as adjusted prices, we would need to identify that explicitly rather than mixing them silently with original tender amounts.

6. What changed over time?

Inflation-adjusted bid prices

The charts we have made so far use nominal cents per tree: 40¢ in 2015 is compared directly with 40¢ in 2025.

We could adjust the annual figures for inflation and show both:

  • Nominal prices, as posted.
  • Inflation-adjusted prices, expressed in a common year’s dollars.

That would help answer whether bids increased faster than general consumer prices. We could also use a more industry-specific cost measure if we find a suitable one, though no single index perfectly captures planting costs such as wages, food, vehicles, insurance and camp expenses.

This would require external data and a clear choice of inflation index.

A before-and-after view of the volume expansion

We could compare bidding patterns across periods such as:

  • 2015–2017.
  • 2018–2020.
  • 2021–2023.
  • 2024–2025.

For each period, show:

  • Prices.
  • Number of bidders.
  • First-to-second gaps.
  • Regional mix.
  • Contract sizes.
  • Share of bids from each company.

The periods could reveal changes around the beetle, wildfire and increased-reforestation years. They would not, by themselves, establish what caused those changes.

Did bid prices rise at the same pace for all companies?

A multi-line chart could compare companies’ annual tree-weighted averages, but I would also build a stronger same-contract comparison to control for differing work mixes.

That could reveal whether, on jobs where they competed directly, the relative gap between two companies became wider, narrower or reversed over time.

7. Unusual contracts and interesting stories

The PDFs contain your descriptions and discussion, not just bid tables. That makes some more qualitative analyses possible.

A catalogue of unusually difficult specifications

Search the posts for references to:

  • Helicopter access.
  • Boats and barges.
  • Long quadding or walk-in distances.
  • Remote camps.
  • Numerous small blocks.
  • Fill planting and burned ground.
  • Fertilizer requirements.
  • Unusual stock types.
  • Steep or rocky ground.
  • Tight completion windows.
  • Extra survey or supervision obligations.

We could then list the associated contracts and their bids. The result might become a fascinating “why this job priced differently” reference.

Some of those categories would need manual review. A post mentioning a helicopter does not necessarily mean that every block, or even the majority of the trees, required helicopter access.

The biggest disagreements over the same ground

Rank contracts by the difference between the lowest and highest qualifying bid, in both dollars and cents per tree.

A wide range can signal very different assumptions about access, production, logistics, risk or the value of keeping a crew employed. The most interesting cases would pair the numbers with whatever you wrote after looking at the blocks.

Because the $1.50 ceiling removes high bids, it would truncate the spread on some jobs. We could still apply your default ceiling, but flag contracts where at least one higher bid was excluded.

Contracts where nearly everyone agreed

Find jobs where several bidders—perhaps at least five—were clustered within a narrow band. Examples could include:

  • All qualifying bids within 10% of the lowest.
  • At least five bids within 5¢ per tree.
  • The smallest range among jobs with six or more bidders.

This would complement the “largest disagreements” list and might identify jobs where companies had unusually similar expectations.

Your historical predictions versus later results

Your posts often include comments about where you thought prices were headed, whether a job looked attractive, and whether a bid seemed low.

A fun retrospective would collect a selection of those comments and compare them with later information in the PDFs:

  • Predictions that were borne out.
  • Predictions that turned out differently.
  • Jobs where the forum discussion identified a risk that later became relevant.
  • Comments about future industry conditions that look particularly interesting in hindsight.

That would be partly editorial and would need care: the PDFs may not tell us whether a contractor actually made or lost money on a job.

The analyses I would prioritize

If you wanted the most informative first batch, I would start with these:

  1. Head-to-head company comparisons, because they compare bids on the same ground.
  2. Largest and smallest gaps between first and second bids, with contract details.
  3. Number of bidders per contract over time, including a clear treatment of missing prices.
  4. Regional and spring-versus-summer price differences.
  5. Contractor-rating reversals, where the posts provide enough detail.
  6. Inflation-adjusted annual bid prices.

Before doing a large series of comparisons, I would rebuild the underlying bid records into a single auditable table with the source PDF and page for every entry. The work we have already done exposed enough missed entries, repeated posts, name variations and inconsistent figures that it would be unwise to treat the existing chart extractions as a finished database. That table would make it much easier to check any surprising result and would give us a dependable foundation for all of the analyses above.

 

 

 

Saturday, October 31, 2026

Creating a KML Elevation Heatmap from a Georeferenced Overview Map

Not long ago, I made a post describing how to use AI to submit a georeferenced overview map in order to create a new KML file which contained boundary lines around each highlighted block.  That set of boundary lines could then be opened in Google Earth or ArcGIS Earth to be able to get a better understanding of the elevation/slope/aspect profiles of each block.  That post can be found here:

https://jonathan-scooter-clark.blogspot.com/2026/10/creating-kml-boundary-lines-around-cut.html

Let's take things a step further.  Let's create a sort of "elevation heat map" where the boundaries are shaded on a colour gradient, to represent relative elevations of various blocks.

 

For this exercise, I used OpenAI's "6.1 Terra" model on the extra-high setting, thinking that should be more than adequate.  I could have set it to the "ultra" setting, but why waste compute resources if not needed?  By the way, I've apparently used the "instant" setting for more than 95% of my queries over the past two months, so I don't frequently use higher power levels except when I'm asking for deep research or spreadsheet/GIS manipulation.  Something people should keep in mind is that higher reasoning tasks sometimes fail on tasks that lower intensity settings can solve properly.  So it's not just a case of conserving energy and compute resources ... you need to learn what models are most appropriate for the complexity of what you're asking, and that's tricky.

Anyway, I uploaded the same "Williams_Lake_2016_Block_Boundaries" kml file that we generated in the post referenced above. This is the prompt that I used:

Are you able to change this KML for me? I'd like to create a sort of "elevation heat map" (for lack of a better term). Can you adjust the colours of the boundary line data throughout this kml, based upon elevation of each segment? Let's use a bright red colour for the very highest elevation of all the boundary line segments. Let's change to a bright green for the very lowest elevation of all the boundary line segments. Then, for every other segment in between, scale the elevation (from lowest boundary to highest) and change the colour of the segment to have an RGB colour value somewhere on a linear scale from bright green (low) to bright red (high). Ask me questions if this doesn't make sense to you.

 

Chat didn't have any questions for me, and got right to work.  It successfully generated the file that I wanted.  I should note that the first time I tried this, I asked it to scale from green (low elevation) to yellow (high elevation), and that didn't look very good, so I switched from yellow to red.  And to be honest, green/red makes a lot more sense.  Green means Go, and you can start lower elevation blocks earlier in the spring.  Red means wait, and the high elevation blocks will probably need to be planted last.

If you're curious what this new KML looked like when I opened it in ArcGIS Earth, here are two screenshots.  The first shows the entire contract (zoomed out to the maximum) and the second shows a close-up of a few of the blocks.

 



Here are some key findings, and things to think about:

1.  I could have fed it a chart listing all the blocks on the contract along with their low and high elevation points for each block.  Foresters often supply such charts in bid packages.  However, this data can only provide a mid-point in elevation of the block, and wouldn't give a true "weighted average" assessed across the entire block.

2.  I thought that Chat would probably average all of the elevations in a fixed interval around each boundary to come up with an average.  This would give a slightly better result, but still not perfect.  For example, what if the block was shaped like a bowl?  The boundary samples would be misleading; higher than expected.  And what if the block had a huge hill in the middle?  In that case, the boundary samples at the base of the hill would be biased to be lower than what the true block average was.

3.  Chat told me that the KML didn't contain any elevation data for any of the points on the boundaries.  Very interesting!  I thought that the KML's that it generated would have pulled elevation Z-data from the original georeferenced maps.  Apparently those maps didn't contain Z-data.  So Chat made the decision to find a terrain dataset that it could cross-reference against the positional data along each boundary, to determine elevations at each point.

4.  But then, this next point is what really impressed me:  Chat decided that using only the boundary as a proxy for block elevation was risky (as I pointed out above, in point 2).  So it decided to make an invisible grid across each block and sample elevation every 20m, then average all of those points, to get a true weighted average elevation across the block as a whole.  If you're curious, it pulled elevation data from Mapzen Terrain Tiles at registry.opendata.aws

5.  Some of the blocks in the KML that I used have "excluded areas," ie. separate boundaries for sections within blocks that weren't to be planted.  Chat ignored those excluded areas when calculating average elevation.  Again, this happened without me asking it to.

Pretty amazing, if you ask me.

 

I decided to wrap up this activity by asking Chat to generate an Excel spreadsheet for me which listed the blocks in elevation order (from low to high).  It did so, including the rank, license and block number (which were embedded in the boundary line attributes), average elevation of the block, and number of samples that it took in order to come up with that elevation (often using thousands of sample on a single block).  Here's [almost] what the spreadsheet looked like:

 


Note:  I did edit this spreadsheet just slightly to turn it from one-column to two-column format, so the screen-snip could show you the entire thing in more detail.  I also centre-justified instead of left-justified the data in most cells.

What's especially impressive in this step is that I didn't tell Chat much about what I wanted in the spreadsheet, I just said to list the blocks ranked low to high.  Also, changing the shading on the cell backgrounds for the elevation column, to match the shading on the KML, was a really nice touch that it thought of.

If you use a similar prompt in your own workflow, you can ask Chat to turn this into a reusable "skill" on your account, which makes it easy for you to replicate the process in a separate chat, rather than as an additional query within the same chat.  I could share the skill file for this, but it's probably just as fast for you to follow my workflow from scratch and ask your own AI to create its own version of the skill on your local computer.  

---

So what's left to do now?  I bet that it would be easy to feed our KML back into Chat and ask it to create coloured polygons instead of coloured boundary lines.  But wait, maybe this wouldn't be easy - it wouldn't be able to have multiple colour-gradients across a single block polygon.  Perhaps it would break the full block polygon up into its special 20m grid, and shade each new sub-polygon appropriately?  I'll leave that to you to figure out.  I'm not going to bother with that step though, because I prefer the boundary-line approach.  Boundary lines let me see what's visible in terms of satellite imagery within the block, if such a layer exists.

By the way, remember that all of this armchair analysis is helpful for getting a better understanding of the surface profile of each block.  But in the end, the only way to truly understand the block is to go out and stick a shovel into the ground.

 

 

 

 

 

 

Saturday, October 24, 2026

Using AI to create Polygons & Caches before Planting a Block

If you're a crew leader, you're probably very accustomed to the tedious task of creating a number of polygons on a block before planting, then calculating how many trees are needed for each polygon, then creating pins for caches with data attached to the pins to show the size of the piece and the predicted number of trees.  It's a fun task, until you've done a few hundred blocks.  Then it gets to be tedious and boring.

What if you could automate this task?  And even better, have KML files generated for you that match your traditional style for cutting up blocks?

This is my suggestion (I haven't tried this yet):

1.  First, collect block maps from about two dozen different sources.  Don't collect them all from a single contract/source, because having a variety of underlying map designs will help improve the skill of your model when running into new designs.

2.  Next, decide on your "parameters" or preferences & limits.  For example, I might decide:  (a) No polygons smaller than 1200 trees; (b) No polygons larger than 4600 trees; (c) Make sure that 60% of polygons are between 1800 and 3600 trees, with 20% between 1200 and 1800 and 20% between 3600 and 4600; (d) If the map has a prescription that indicates multiple species, ignore that and simply calculate the number of trees for each piece, based upon the size of the polygon in hectares multiplied by the target density in stems/hectare.

3.  Spend a few hours creating sets of polygons which roughly follow the above rules, going through one block map at a time and manually creating polygons.

4.  Create caches based on where you think the best locations are.  Use some sort of standard naming convention for cache pins, ie. the Aviation alphabet, a numbering system, etc.  For each pin, include the metadata in the label which includes the size of the piece (polygon), the target density, and the trees required for the piece.

Once you have all of these set up, go into your AI (such as Work if you're subscribed to OpenAI, Co-Work if you're subscribed to Claude, or Spark if you're subscribed to Gemini).  Tell it that you want it to learn your preferences for generating polygon and cache pin data from block maps, and that you're going to feed it a few dozen examples of KML files that you created based upon studying specific block maps.  Tell the AI that you don't want it to analyze yet, but you're going to feed in all the maps and KML's first.  Make sure that the file names are designed in a way to ensure that the AI correlates them properly, ie. "Block 01 map.pdf" and "Block 01 layout.kml"

 


 

After Work has all of the files, ask it to correlate all block maps with the relevant KML's that you created, and analyze your patterns in creating polygon layers, because you want it to be able to do the same thing in the future.

Once it has analyzed all of your files, give it a fresh map and ask it to create a block layout kml for that block, with a specific set of preferences for that exact block (which may vary slightly from what you were mentally aiming for above).  As an example, use this prompt:

Now that you see the patterns that I use when creating Planting Piece Layout KML's, I want to give you a new block map and have you create a layout for me.  Keep the following rules and preferences in mind:

1.  Rule - polygons must cover the entire block, and must not overlap each other.

2.  Rule - the target density for this block is XXXX stems per hectare. 

3.  Rule - no pieces/polygons can be smaller in size than that which would create a 1200-tree piece, based upon the target density that I just provided.

4.  Rule - no pieces/polygons can be larger in size than that which would create a 4400-tree piece, based upon the target density that I just provided.

5.  Rule - for each polygon that you create, name the polygon according to a series starting with "Piece 01," then "Piece 02" and so on.  In addition, the size of the piece (in hectares) and the number of trees required (at the target density) should be included in the name of each polygon.

6.  Rule - for each Cache that you create, add a name using the aviation alphabet going through in sequence, ie. the first cache should be called Alpha, the second cache should be called Bravo, etc.  In addition to the Cache name, the name of the pin should include which polygons it services, and the total number of trees required, ie. "Alpha, services pieces 07 and 11, needs 7,941 trees."

7.  Rule - cache pins can only be created along the border of a piece.  In addition, cache pieces should always be located on a road or trail.

8.  Preference - I'd like approximately 20% of the polygons to range between 1200 and 1800 trees in size, approximately 60% of the polygons to range between 1801 and 3600 trees in size, and approximately 20% of the polygons to range between 3601 and 4400 trees in size.

Now this is starting to get complicated.  I'm approaching this concept theoretically, without having tried it yet.

Hold these thoughts.  I'm going to have to create a set of block maps and piece layers myself, and see how the AI model responds.  I'll do all the layers on my next cross-country flight in early November.

I'll revisit this post as soon as I get this done.  I'm also thinking that instead of turning this into a Skill, maybe I can take this even further and develop a standalone app that lets a user submit a map, and then the app creates a suggested block layout.

 

 

 

Thursday, October 22, 2026

Simple Transcription of Block Viewing Notes while using AI

This next tip for using AI is a pretty simple one.  You can use it to transcribe notes.

Everyone is accustomed to the idea of buying a small voice recorder to carry around and make notes to yourself (I used to have one that used mini-cassette tapes).  More recently, cell phones have all kinds of free apps on them which work as basic digital voice recorders, ie. apps such as Parrot, Easy Voice, Google Recorder, etc.

Up until around 2019, these apps worked purely as recorders, until Google Recorder introduced transcription services.  But that capability was not well-known for years, and it was really only around 2024 that transcription started to explode (possibly mostly due to the massive popularity of Samsung Voice Recorder).

You're probably wondering why I'm saying that the use of AI to transcribe spoken recordings is notable?  Well, it's not that notable.  But you can step things up a notch.  Keep reading below.

 


 

Let's pretend that I'm out looking at a contract, and I need to visit a few dozen blocks and make notes.  I can start a new AI chat (using the lowest-power Instant setting) with the following prompt:

I'm starting the viewing of a tree planting contract.  The contract number is PL26CCF001.  I'm going to be visiting hopefully all of the blocks on this contract over the next day or two.  As I get to each block, I'm going to give you the unit number first, then my stream-of-consciousness thoughts about the block.  I don't want you to do anything except save my notes - no analysis, no rewriting, no editing please.  Once I'm done, I'll probably ask you some specific questions at a later date.

Now, as I visit each block, I can enter notes for that block.  At this point, keep in mind that I'm sending my queries and notes as spoken prompts, not entering text on the phone.  For example:

I just looked at unit CCF 050.  The schedule B says that this one is three species, with an elevation range from 1100-1390 meters.  It calls for 70,560 trees.  The target density is two thousand stems per hectare but they’re expecting us to achieve about eighteen hundred stems, so they’ve noted a tiny bit of regen.  I agree with this assessment.  This is standard burned mature forest, but it’s a bit ugly.  I drove the truck to this. I shouldn’t have. I got trapped in a spot that was either going to need hours of chain saw to get ahead to a turnaround, or a 12-point turn on the side of a cliff. The proper play here is to park 400m before the tiny north piece and then walk/ATV in. A couple trucks can park where they would turn from the blue road showing on the block map. We might might be able to clear out the brown road on the overview for side-by-sides with one day of work for two people. However, the side-by-side trailer would probably need to be turned around by hand up at the top.  Anything past unit CCF 054 is 350’s only.  The small crews will have to do this block, because 550’s shouldn’t come to this one.  Only plant this block when the roads are dry.  It’s a sketchy road, unless you come in by side-by-side for the last four kilometers.  This will be one of the last blocks on the contract due to the elevation. Maybe we’ll run out of trees before getting to it though.  Mental note – try to run out of trees before getting to this one.  The bottom of this block is very steep.  This one is pretty tricky.  Better make sure the planters get twenty-six cents per tree on this one.

Then I'll enter that, and Chat responds with something like, "I've received and saved your notes for CCF 050.  I have not done any analysis.  I'm ready for your next block."  At this point, I move to the next block.

A day or two later, once I'm done the same thing with every block, I'll start with a simple query like this:

Help me preserve my original notes by combining all of my comments to date in this Chat and formatting them into a single large text box that I can cut and paste into a Word document.

At this point, I don't even ask Chat to create the Word document, simply because at the moment, that's currently better accomplished in Work than in Chat.  But if I wanted to go that route, I'd prompt with "Let's move this to Work, and please create a Word document for me ..."

At this point, we still haven't accomplished anything other than a fairly fancy transcription of notes, moved into a Word document.  No big deal.  But at this point, Chat has all my thoughts about the contract.  Let's up the game slightly now, with this prompt:

Can you move all of these notes to Work please.  I'm also attaching the Schedule B1 from the forester.  I'd like you to perform the following tasks:

1.  Take my planter prices from my viewing notes and insert them into the Bid Price column (column L) in the Schedule B1.  Do the math for the block sub-totals too (column M).  Do not alter anything else on the sheet.  Do not edit or change any existing cells on the spreadsheet other than in columns L and M.  Give me a link to download the edited spreadsheet.

2.  Create a short one-page summary report detailing all recommended helicopter needs for the job, as per my notes.

3.  Create a short one-page summary report detailing all of my trail-cutting needs for the job, as per my notes.

4.  Create a short one-page summary report detailing where we're going to need side-by-sides for the job, as per my notes.  Ensure that this report identifies how many trees are related to these needs.

Now you can see why using AI for transcription really speeds up your eventual work flow.

 - Scooter

 

PS:  Send me an email at scooter@replant.ca with your suggestions on how you use AI in tree planting, and I might incorporate them into this series of blog posts.  I'd love to get some good private discussions happening too.